ConocoPhillips
site map | contact us
Search
Site Title

Environment

small red bullet Get Adobe Acrobat Reader
This software is required for viewing the document links on this page.

Darwin LNG Pty Ltd

Construction Environmental Management Programme

A number of documents which together, will form the complete Environmental Management Programme (EMP) for the Darwin Liquefied Natural Gas (DLNG) Project on Wickham Point in Darwin Harbour. At this stage of the project, four volumes of the EMP are envisaged as follows:

  • Volume I – EMP Overview and Compliance Audit Register provides an overview of the EMP framework and the consolidated commitments and auditing protocols for the responsible construction and operation of the DLNG Project;
  • Volume II – Construction Phase EMP is specific to managing environmental factors relevant to the initial phases of site clearing and construction for the DLNG Project;
  • Volume III - Dredge and Spill Disposal Construction Phase EMP was not developed because no dredging operations were required; and,
  • Volume IV – Operations EMP for the safe and environmentally responsible operation of the LNG Project, including detailed emergency response manuals and ongoing monitoring commitments - see Operations Environmental Management Plan below.

The staged development of the EMP reflects the logical focus on environmental planning for issues that are of relevance to a particular stage of project development (i.e. construction, dredging, commissioning and operation).

Volume I and Volume II have been developed, submitted to and accepted by the Northern Territory Government Department of Infrastructure, Planning and Environment (DIPE) and Environment Australia (EA).

To view Volume I, please click on the appropriate link below:

Volume I : EMP Overview and Compliance Audit Register   (1,138kb)

Appendices

EMP Vol I : Appendix A – DIPE Report   (1,504kb)
EMP Vol I : Appendix B – EA Report   (264kb)

To view Volume II, please click on the appropriate link below:

Volume II : Construction Phase EMP – Updated April 2005   (444kb)
Volume II EMP: CEMP 1 Weed Management   (103kb)
Volume II EMP: CEMP 2 Vegetation Clearing and Management   (60kb)
Volume II EMP: CEMP 3 Biting Insect Management   (66kb)
Volume II EMP: CEMP 4 Construction Soil Erosion Control and Management   (197kb)
Volume II EMP: CEMP 5 Dust and Noise Management   (85kb)
Volume II EMP: CEMP 6 Fire Prevention   (75kb)
Volume II EMP: CEMP 7 Acid Sulfate Soil Control and Management   (62kb)
Volume II EMP: CEMP 8 Protection of Archaeological & Heritage Values   (58kb)
Volume II EMP: CEMP 9 Larrakia Liaison and Consultation   (29kb)
Volume II EMP: CEMP 10 Vegetation, Mangrove Management and Monitoring   (323kb)
Volume II EMP: CEMP 11 Terrestrial Fauna Management and Monitoring   (182kb)
Volume II EMP: CEMP 12 Construction Waste Minimisation and Management   (154kb)
Volume II EMP: CEMP 13 Workforce Management and Transportation   (386kb)
Volume II EMP: CEMP 14 Hydrotest Water Discharge Protocol   (49kb)

Appendices

Volume II EMP: Appendix A HSE Plan – Part 1  (2,199kb)
Volume II EMP: Appendix A HSE Plan – Part 2 (1,925kb)
Volume II EMP: Appendix B Emergency Response (164kb)
Volume II EMP: Appendix C Spill Avoidance and Control (90kb)
Volume II EMP: Appendix D Environmental Inspection and Audit (92kb)
Volume II EMP: Appendix E Vegetation/Weed Risk Analysis (1,214kb)
Volume II EMP: Appendix F Acid Sulfate Soils Report (2,271kb)
Volume II EMP: Appendix G Archaeological and Heritage Assessment Protocol (1,014kb)
Volume II EMP: Appendix H Mangrove Monitoring Programme (79kb)
Volume II EMP: Appendix I Baseline Feral Animal Survey (2,476kb)
Volume II EMP: Appendix J Baseline Geochemical Surveys (1,702kb)

Annual Review

In 2004, Darwin LNG Project completed a review of the existing Environmental Management Programme (EMP) which identified updates to the EMP to reflect improvements in knowledge and understanding gained during the early stages of construction. The Office of Environment and Heritage accepted the EMP review in October 2004. To view the 2004 EMP Review, please click on the link below.

Annual Review of Darwin LNG Environmental Management Programme (EMP) August 2004   (3,746kb)

Back to Top

Operations Environmental Management Plan

To view the Operations Environmental Management Plan, please click on the appropriate link below:

Operations Environmental Management Plan - Table of Contents  (108kb)
Operations Environmental Management Plan - Section 1  (616kb)
Operations Environmental Management Plan  - Section  2  (2,185kb)
Operations Environmental Management Plan  - Section  3  (3,625kb)
Operations Environmental Management Plan  - Section  4  (3,625kb)
Operations Environmental Management Plan  - Section  5  (3,624kb)
Operations Environmental Management Plan  - Section  6  (3,349kb)
Operations Environmental Management Plan  - Section  7  (3,350kb)

Operations Environmental Management Plan  - Appendix A  (3,348kb)

Back to Top



Public Environmental Report

A Public Environmental Report was developed for the proposal to construct and operate an expanded LNG plant at Wickham Point near Darwin, Northern Territory of up to 10 million tones per annum (MTPA) capacity. It was submitted by DLNG Project Team to provide the Northern Territory Government, agencies of the Commonwealth of Australia, and the public with the information necessary to allow an informed appraisal of the environmental acceptability of the proposed project.

Recommendations received from the Northern Territory Government and Environment Australia have been incorporated into Volume I and Volume II of the EMP.

To view the Public Environmental Report, please click on the appropriate link below:

Darwin 10 MTPA LNG Facility : Public Environmental Report - Table of Contents  (833kb)
Darwin 10 MTPA LNG Facility : Public Environmental Report - Exec Summary  (1,018kb)
Darwin 10 MTPA LNG Facility : Public Environmental Report - Section 1  (774kb)
Darwin 10 MTPA LNG Facility : Public Environmental Report - Section 2  (1,297kb)
Darwin 10 MTPA LNG Facility : Public Environmental Report - Section 3 (Part A)  (1,110kb)
Darwin 10 MTPA LNG Facility : Public Environmental Report - Section 3 (Part B)  (820kb)
Darwin 10 MTPA LNG Facility : Public Environmental Report - Section 3 (Part C)  (604kb)
Darwin 10 MTPA LNG Facility : Public Environmental Report - Section 4  (1,119kb)
Darwin 10 MTPA LNG Facility : Public Environmental Report - Sections 5-6  (1,232kb)

Appendices

PER : Appendix A  (250kb)
PER : Appendix B  (418kb)
PER : Appendix B - Figure 1  (149kb)
PER : Appendix B - Figure 2  (2,195kb)
PER : Appendix B - Figure 3  (220kb)
PER : Appendix C (Part A)  (890kb)
PER : Appendix C (Part B)  (214kb)
PER : Appendix C (Part C-i)  (1,145kb)
PER : Appendix C (Part C-ii)  (508kb)
PER : Appendix C (Part C-iii)  (561kb)
PER : Appendix C (Part C-iv)  (738kb)
PER : Appendix C (Part C-v)  (991kb)
PER : Appendix C (Part D)  (991kb)
PER : Appendix D  (676kb)
PER : Appendix E  (644kb)
PER : Appendix F (Part A)  (1,162kb)
PER : Appendix F (Part B)  (2,670kb)
PER : Appendix F (Part C)  (182kb)
PER : Appendix G (Part A)  (597kb)
PER : Appendix G (Part B-i)  (2,782kb)
PER : Appendix G (Part B-ii)  (437kb)
PER : Appendix G (Part C-i)  (96kb)
PER : Appendix G (Part C-ii)  (127kb)

Back to Top

Exceptional Development Permit (EDP)

An application under section 38(1) of the Planning Act 1999 to develop Section 1812, Wickham Point, Hundred of Ayers for the purpose of a 10 MTPA LNG Plant. Following an extensive public consultation period and public hearing conducted by the Development Consent Authority, the decision by Lands and Planning Minister to grant an Exceptional Development Permit was made 11 November 2002.

To view the Exceptional Development Permit, please click on the link below:

Exceptional Development Permit – EDP02/0015  (845kb)

To view the Variations to the EDP, please click on the links below:

Variation Permit – EDP02/0015A  (415kb)
Variation Permit – EDP02/0015B  (72kb)
Variation Permit – EDP02/0015C  (87kb)
Variation Permit – EDP02/0015D (234kb)

Back to Top

Environment Protection Licence (EPL - LNG01)

An Environment Protection Licence, issued under the Waste Management and Pollution Control Act (NT), was granted to ConocoPhillips Australia Pty Ltd on 9 December 2005. This Licence permits the Darwin LNG Plant to produce liquefied natural gas and natural gas liquids.

To view the Environment Protection Licence (EPL - LNG 01), please click on the link below:


http://www.nt.gov.au/nreta/environment/waste/register/pdf/other/epl_conocophillips.pdf


Back to Top


DLNG Compliance Reports

The following reports have been developed to fulfill the commitment outlined in the Darwin LNG Plant Environmental Management Programme (EMP) Volume I - EMP Overview and Compliance Audit Register, Section 5 - Compliance Auditing and Reporting, which requires a compliance report to be submitted 60 days after site construction commences and annually thereafter.

  • DLNG Compliance Report Summary For 23 June 2004 To 22 June 2005, summarises the activities for the various environmental issues/aspects applicable for this reporting period.

    Compliance Report Summary 2004-2005 (838kb)

  • Darwin LNG Compliance Report Register For the Period 23 June 2004 To 22 June 2005, indicates the compliance status for each of the commitments/safeguards listed in the EMP Volume I, Table 5.1 Environmental Compliance and Audit Table for the Darwin LNG Project, and the permit conditions listed in the Exceptional Development Permit and Environment Protection Approval No. 1.

    Compliance Report Register 2004-2005 (779kb)

  • Darwin LNG Project – Baseline Monitoring Studies and Results to Date, summarises the environmental baseline monitoring conducted through 22 June 2005 for the Darwin LNG Project.

    DLNG 2004-2005 Environmental Monitoring Summary (612kb)

  • DLNG Compliance Report Summary For 23 June 2003 To 22 June 2004, summarises the activities for the various environmental issues/aspects applicable for this reporting period.

    2004 Annual Compliance Report Summary (61kb)

  • Darwin LNG Compliance Report Register For the Period 23 June 2003 To 22 June 2004, indicates the compliance status for each of the commitments/safeguards listed in the EMP Volume I, Table 5.1 Environmental Compliance and Audit Table for the Darwin LNG Project, and the permit conditions listed in the Exceptional Development Permit and Environment Protection Approval No. 1.

    2004 Compliance Report Register (76kb)

  • Darwin LNG Project – Baseline Monitoring Studies and Results to Date, summarises the environmental baseline monitoring conducted through 22 June 2004 for the Darwin LNG Project.

    Baseline Monitoring Summary (133kb)

    Figure 1 - MMP sites (445kb)

  • DLNG Compliance Report Summary For 23 June 2003 To 20 August 2003, summarises the activities for the various environmental issues/aspects applicable for this reporting period.

    Final Compliance Report Summary - Rev 3 10 Nov 2003  (95kb)

  • Darwin LNG Compliance Report Register For the Period 23 June 2003 To 20 August 2003, indicates the compliance status for each of the commitments/safeguards listed in the EMP Volume I, Table 5.1 Environmental Compliance and Audit Table for the Darwin LNG Project, and the permit conditions listed in the Exceptional Development Permit and Environment Protection Approval No. 1.

    Final Compliance Register - Rev 3 10 Nov 2003  (122kb) 
     


Last Updated:


© ConocoPhillips Company. All rights reserved. Legal, Privacy and Security Notices.